Documentation

 

Injection optimization

  1. ETL.BHN10 injection optimization

 

Commissioning notes

  1. Xe 2017 commissioning
  2. Modifying E-Cooler Current

 

New Schottky application user guide and how to take/load reference measurements

  1. New Schottky application user guide and how to take/load reference measurements

 

Reference measurements - How To (old schottky application)

  1. Schottky reference measurements

 

Cycle Generation & Optics

Cycle Generation & Optics

How to add new optics into GMAD LSA

Xe39 Cycle Generation 

 

Beam Instrumentation

IPM:

read IPM data from timber ==> a short script to read out the (new) IPM data of the MDB with Python in a Jupyter notebook.

It is as usual to be found MD Folder on cernbox: https://cernbox.cern.ch/index.php/s/smW6T9GoNkfpQLU or:

 /eos/user/s/shirlaen/LEIR/Linac3MDs/TimberData/scripts/ReadIPMFromTimber.ipynb

 

RF

System Overview

Servo Loop Operation

Setup Parameters Nominal beam

Setup Parameters Early beam

How to advance RF Capture

 

BTrain

Cycles needed for new Btrain commissioning

 

Articles

Longitudinal emittance reduction in LEIR of ion beams for LHC

Energy Matching Between LEIR and PS

LHC Injectors Upgrade TDR

Chromaticity in LEIR performance 

A Collimation Scheme for Ions changing Charge State in the LEIR Ring

YASP for LEIR to PS injection

 

Presentations

Operational Presentations