LEIR/SPS Operators Training Corner

All the documentation related to training can be found in the following EDMS directory

The directory is organized in four main parts: a general accelerator physics training, SPS dedicated training, LEIR dedicated training and specific training concerning the control system.

Some flavour of the contents covered by the training pages can be found below.

General Accelerator Training:

complex
  • Introduction to accelerator physics

  • Overview of the CERN accelerator complex

  • Overview of the SPS

  • Overview of LEIR

  • Overview of Linac 3

SPS Training:

SPS
  • LSA and high level parameter control

  • RF system

  • Transverse Feedback System

  • Beam Instrumentation

  • Beam Transfer

  • Timing system and cycle management

  • SPS Machine Protection System

  • SPS Safety

  • SPS vacuum and a-C coating

  • Tuning and operation

LEIR Training:

LEIR
  • LSA and High Level Parameter control

  • RF system

  • Transverse Feedback System

  • Electron cooler

  • Beam instrumentation

  • Beam Transfer

  • Timing system and cycle management

  • NOMINAL beam commissioning

  • LEIR beam intensity limitations

Accelerators Control Training:

Controls
  • The new NXCALS system

  • Introduction to LSA basic concepts

  • Overview of the LSA App Suit, settings management and database configuration

  • Beam Performance Tracking tool

  • Optimization algorithms and Machine Learning for the CERN Accelerators